
As General Makina, we maintain our presence in the Balkan market with high-tonnage engineering solutions. Successfully installed, field-tested, and commissioned in the Belgrade region of Serbia, our 400 T/H Stationary Mining Crushing Plant project was engineered to meet the aggregate production demands of major infrastructure and mining quarry operations in the region.
Developed to withstand heavy-duty conditions, our plant boasts a high crushing and screening capacity averaging 400 Tons per hour. In the primary crushing stage, the GNR PDK01 Primary Impact Crusher delivers exceptional reduction ratios, while the high-performance GNR 130 Tertiary Crusher operates in the fine crushing stage to enhance final product quality.
This high crushing power is supported by heavy-duty vibrating screen systems and conveyor belt networks. Manufacturing precisely sized cubical aggregates that meet road, concrete, and construction standards, our Belgrade mining crushing plant project continues uninterrupted production at low operational costs at the job site in Serbia.